go to text

Retail electricity business

*We are temporarily suspending new applications.

Grant of "Electricity and gas price drastic change mitigation countermeasure business subsidy" decided

We are participating in the "measures to mitigate the sharp decline in electricity and gas prices (hereinafter referred to as this project)" by the Agency for Natural Resources and Energy of the Ministry of Economy, Trade and Industry.
Since we have applied and received the grant decision notice, we will implement the following measures for all of our customers.
 
[Outline of the project to mitigate drastic fluctuations in electricity and gas prices]
For all customers, from the February meter reading, the fuel cost adjustment unit price will be reduced by the amount obtained by multiplying the amount used by the unit price below.
 
【unit price】
Low voltage 7 yen/kWh
 
[Applicable period]
February 2023 meter reading (January usage) to October 2 meter reading (September usage)
*Applicable from 2023/3 billing.
*Invoice will show the amount after discount.
 

Please note that the Electricity Supply Agreement will be amended according to the attached "Other Supply Conditions".
 

For inquiries about this project, please visit the special website of the Agency for Natural Resources and Energy, Ministry of Economy, Trade and Industry, or contact the office by phone.



Countermeasures for alleviating drastic fluctuations in electricity and gas prices Secretariat 
Contact point for consumers (toll-free number)
0120-013-305
All day from 9:00 to 17:00
 

Power supply mechanism of CV21 power

CV21 poweris in charge of retailing electricity, but the task of delivering electricity to customers is
It is the same power transmission and distribution company as before.

POINT of power supply of CV21 power

 Reduction of electricity charges

basic fee and
Electricity charges
cheaper

   Same quality

electricity supply reliability and
Quality as before
no change at all

   Easy switching

Just fill in the documents
Switching is completed.

   Switching 0 yen

contracts and procedures
No cost

POINT of electricity liberalization

You will be able to freely choose the electric power company.
All the quality of electricity remains the same.

Kansai Electric Power Jurisdiction Version Price Plan

Family-friendly reduction plan

■ Comparison of electricity rate unit price (yen / kWh)
Minimum charge (per contract)
Kansai Electric Power Metered Light A
CV21 Electric Power Home Appliance Light A
341.01
333.72
Electric energy charge
(KWh)
15-120
20.31
20.13
120-200
25.71
25.80
200-300
25.71
21.34
300
28.70
24.39

Reduction plan for stores and businesses

■ Comparison of electricity rate unit price (yen / kWh)
Basic charge (per 1kVA)
Kansai Electric Power Metered Light B
CV21 Electric Power Shop Lamp B
396.00
356.4
Electric energy charge
(KWh)
-120
17.91
15.95
200-300
21.12
19.51
300
23.63
21.58

Kyushu Electric Power jurisdiction version rate plan

Family-friendly reduction plan

■ Comparison of electricity rate unit price (40A, yen / kWh)
Basic charge
* 5% discount from Kyuden
Kyushu Electric Power Metered Light B
CV21 Electric Power Home Appliance Light B
1,188
1,128.6
Electric energy charge
(KWh)
-120
17.46
16.58
120-300
23.06
21.90
300-600
26.06
24.75
600
23.75

Reduction plan for stores and businesses

■ Comparison of electricity rate unit price (yen / kWh)
Basic charge (per 1kVA)
Kyushu Electric Power metered lamp C
CV21 Electric Power Shop Lamp C
297.00
282.15
Electric energy charge
(KWh)
-120
17.46
16.58
120-300
23.06
21.90
300-600
26.06
24.75
600
22.75

We will answer such anxiety about power switching

Q What will change with retail liberalization?
Q What is the procedure and period for power switching?
Q Is it possible to purchase electricity for an apartment house?
Q Is there a power outage without supply?
Q What happens if I go bankrupt?
Q What is the cancellation fee when canceling the current contract?
Q Is there a power outage without supply?
Q Is a new line drawn at home?
Q Is there a problem with power outages and electrical quality?
Q Where can I contact if a power outage occurs?
Q Where do you request the new electric wire to be pulled in?

To everyone after the electricity contract (to each link)

You can see billing data and electricity usage data every 30 minutes.
It describes the calculation method of the charge.
It describes the calculation method of the charge.
20244
Sun
Mon
Tue
Wed
Thu
Fri
Sat
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Clean Venture 21 Corporation

612-8445
Kyoto City, Fushimi-ku, Takeda Jobodain-cho 41

TEL.075-612-2100
FAX: 075-612-2177
Back to TOP